Elk City 1 & 2 Wind Energy Center

The Elk City 1 & 2 Wind project was sited in an area that Hilliard Energy identified to NextEra Energy Resources (formally known as FPL Energy) as a project that would provide all the right ingredients for a successful wind project.

The Elk City 1 & 2 Wind project was sited in an area that Hilliard Energy identified to NextEra Energy Resources (formally known as FPL Energy) as a project that would provide all the right ingredients for a successful wind project.

• Located in Roger Mills and Beckham Counties, Oklahoma

• Operated by a subsidiary of NextEra Energy Resources

• Approximately 30,000 acres

• Combined, the site is capable of generating enough electricity to power more than 59,000 homes

Phase 1

• A 98.9 MW name plate capacity
• 43 2.3-megawatt Siemens wind turbines

Phase 2

• A 100.8 MW name plate capacity
• 48 1.5-megawatt GE wind turbines

Hilliard Energy provided the following services in the development of this wind energy center:

Strategic Planning, Route and Site Selection, Feasibility and Cost Estimation Studies, Surface Land Acquisition, Data Management, Mapping-all GIS types, Abstracting, Survey Permission and Notification, Due Diligence, Title Curative, Landowner Relationship Development and Local Community Relations Meetings